Bathroom Remodel Costs
TYPICAL HALL BATH (5′ x 8′)
On the pricing chart below; the “Basic“, “Mid” & “Upper” levels, distinguish which finish you choose.
TYPICALLY MOST PROJECTS LAND BETWEEN MID & UPPER LEVELS
Basic Level
- Keep Existing Tub
- Ceramic Tile Floor & Shower Walls
- Level 1 Plumbing Fixtures
- Level 1 Vanity Cabinetry
- Level 1 Granite Remnant Top
- Electrical Updates
- Shower Door NOT Included
- Fixtures Remain in the Same Locations
Mid-Level
- Replace Existing Tub with Tub or Fiberglass Shower Base
- Porcelain Tile Floor & Shower Walls
- Level 2 Plumbing Fixtures
- Level 2 Vanity Cabinetry
- Granite/Quartz Remnant Top
- Electrical Changes/Updates
- Shower Door NOT Included
- Fixtures Remain in the Same Locations
Upper Level
- Remove Tub & Replace with Tile Base Shower
- Porcelain or Natural Stone Tile Floor & Shower
- Level 3 Plumbing Fixtures
- Level 3 Vanity Cabinetry
- Granite/Quartz Remnant Top & Shower Pieces
- Electrical Changes/Updates
- Custom Shower Doors
- Fixtures May Be Moved
INCLUDED:
Space planning and layout design with our designer, a dedicated project manager, and all labor & materials. access to our customer portal where you can monitor progress and design selections via your phone and computer.
NOT INCLUDED:
Permit fees, smoke detector upgrades (code requirement for most areas), painting or staining, decorative light fixtures, mirrors, and bath accessories.
LARGER MASTER BATHROOM
On the pricing chart below; the “Basic“, “Mid” & “Upper” levels, distinguish which finish you choose.
TYPICALLY MOST PROJECTS LAND BETWEEN MID & UPPER LEVELS
Basic Level
- Replace Existing Tub & Shower Base with New Fiberglass Tub & Shower Base (Keep Existing Sizes & Locations)
- Porcelain Tile Floor & Shower Walls
- Level 2 Plumbing Fixtures
- Level 2 Vanity Cabinetry
- Granite/Quartz Remnant Top
- Electrical Updates
- Custom Shower Doors
- Fixtures Remain in the Same Locations
Mid-Level
- Remove Existing Tub & Shower. Expand Existing Shower with Mudbase Tile Shower (Tub is Not Included)
- Porcelain Tile Floor & Shower Walls
- Level 3 Plumbing Fixtures
- Level 3 Vanity Cabinetry
- Granite/Quartz Remnant Top & Shower Pieces
- Electrical Changes/Updates
- Custom Shower Doors
- Limited Fixture Movement
Upper Level
- Remove Existing Tub & Shower. Install New Tub, Expanded Mudbase Tile Shower with Seat
- Natural Stone Floor, Shower Base & Walls
- Level 4 Plumbing Fixtures
- Level 3 Vanity Cabintry w/Linen Cabinet
- Granite/Quartz Remnant Top & Shower Pieces
- Electrical Changes/Updates
- Custom Shower Doors
- Fixtures May Be Moved
INCLUDED:
Space planning and layout design with our designer, a dedicated project manager, and all labor & materials. access to our customer portal where you can monitor progress and design selections via your phone and computer.
NOT INCLUDED:
Permit fees, smoke detector upgrades (code requirement for most areas), painting or staining, decorative light fixtures, mirrors, and bath accessories.
Starting a remodeling project
We understand how difficult it is to undertake a comprehensive kitchen renovation project. That’s why we don’t offer “quick-fixes” or utilize poor construction materials. It takes time to get things right. It’s as simple as that. We wouldn’t have it any other way.
It is be a big decision to undertake a significant remodeling project or to start from the ground up, but it may be the best method to acquire your ideal house. It’s difficult to predict the cost of adding on a room since there are so many variables to consider. Depending on square footage, construction materials, and personal preferences, we may require assistance from an architect. To discuss your project and estimate costs, give us a call now.
How we price a project
Pricing varies significantly from project to project, primarily depending on your budget. During our first discussion, we’ll explain which ideas will and won’t work for you. Take a look at the numbers below to get a better feel for what some of our small to large full remodel projects cost. Keep in mind that these are only estimates based on prior work in Southeast Michigan. Every project is different; therefore, costs vary considerably.